Industrial standard factory building project

Project Name: Progress of the construction of the new industrial standard plant construction No. 15 and No. 16#: filing and construction period: July 2011 - March 2012 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation facilities, Lighting facilities, cranes.
Project Introduction:
The project is located in the north of the Ninth Avenue in the Zhengzhou Export Processing Zone, Ninth Avenue, Zhengzhou Economic and Technological Development Zone, and the new No. 15 and No. 16 industrial standard plant construction projects. The construction land area of ​​this project is 7805.34 square meters and the total construction area is 18845. Square meters. Including two standard factory buildings with five shelves, all of which are frame structures, standardization construction, and standardization of production facilities and equipment. With a height of 23.9 meters, a floor area ratio of 2.41, a building density of 48.1%, and a green coverage rate of 18.6%, it can be used in the production of electronic, mechanical, and super-hard materials and other industries. Mainly leased to Zhengzhou Export Processing Zone to enter the project, with good prospects.

The total investment of the project: 40 million yuan, of which the enterprise will raise 20 million yuan by itself and the domestic bank loan will be 20 million yuan.

Construction Unit: Zhengzhou Shengyang Export Processing & Development Co., Ltd. Postal address: Zhengzhou Economic and Technological Development Zone Zip code: 450000
Contact: Guo Dahai Telephone

Related Developments: Tower Crane Infrastructure Project

Brake Pad

Brake Pads And Rotors,Best Brake Pad,Brake Pad Replacement,Disc Brakes

Airui Brake Systems Co., Ltd. , http://www.wfbrakeplate.com