Considering the strategic position of wind power development

From the perspective of development trends, wind power, as an emerging industry, has the characteristics of long industrial chain, large demand for supporting and supporting industries, and has a good leading role in economic development. As technology upgrades continue to accelerate, wind turbines are becoming larger and more characteristic. Wind power gradually expands from supplemental energy sources to main alternative energy sources. The proportion of power systems in the power system will increase steadily. The status as a strategic emerging industry will gradually become more prominent, and the supporting role for the global green sustainable development will become more significant.

The delegates and experts suggested that China’s energy transformation must first be transformed from a concept. It is necessary to study the roadmap for wind power development, formulate a more clear energy development strategy from the perspective of global energy transformation and sustainable development of China’s economy, and consider the development of wind power. The strategic position. In addition, only expanding the scope of resource allocation can solve the current bottleneck problem of wind power development. In the past, the industry was paying more attention to electricity generation. It also needed to solve a series of problems currently facing from the demand side, including the microgrid and energy storage technology. In addition, in the future more market-oriented solutions will be needed to resolve the contradiction between supply and demand and promote the healthy development of the industry.

On September 24, Ziguangge magazine co-organized a seminar on wind power development with Guodian Group. The theme of this symposium was "Promoting the development of wind power and building green China". Yao Zhiping, deputy secretary of the central government's working committee, Qiao Baoping, chairman of the Guodian Group and secretary of the party group, addressed the forum. The deputy general manager of the Guodian Group and Xie Changjun, a member of the party group, attended the conference. . Leaders of national ministries and commissions such as the National Development and Reform Commission, the Ministry of Environmental Protection, the Development Research Center of the State Council, the National Energy Administration, the State Oceanic Administration, and the China Electric Power Enterprise Association, China Electric Power Research Institute, and Tsinghua University were invited to attend the meeting. The issue was studied.

From the seminar, we learned that as the world's largest wind power country, China's wind power installed capacity and power generation have exceeded nuclear power, becoming the third largest power source after thermal power and hydropower. As of the end of 2013, a total of 1352 wind farms were connected to the grid for power generation, and 58601 wind turbines were hoisted. At the end of 2013, the grid-connected installed capacity of wind power was 77.16 million kilowatts, which accounted for 6.2% of the total installed capacity of the country's total power supply; the annual on-grid electricity of wind power reached 135.7 billion kwh, accounting for 2.5% of the nation's on-grid electricity, which was an increase of 0.5 percentage points year-on-year. In addition, China's wind power equipment manufacturing industry not only meets the needs of domestic wind power construction, but also gradually moves into the international market, becoming one of China's competitive industries with competitive advantages. Some wind turbine manufacturers have entered the top 10 globally. In 2013, domestic manufacturers have occupied more than 90% of China's market share and started to export overseas.

However, with the expansion of wind power, China's wind power industry has also experienced problems such as uncoordinated development, unsuitable grid operation, weak innovation capacity, inadequate support for policy implementation, inadequate market supervision, and limited wind curtailment. In addition, the on-grid electricity price of wind power in China is still relatively low compared with the international market. The price adjustment will have a greater impact on wind power companies. Data show that since the beginning of this year, the national wind power industry's loss has expanded to more than 50%.

Warranty
Sitong grants our clients a twelve-month-period or 3000-hours warranty for any machine purchased from us.
During the warranty period, in case the defect of material or workmanship has occurred with spare parts in normal operation. the defective part will be repaired and replaced free of charge, at our discretion.

Spare Parts
Sitong is dedicated to provide our clients with genuine spare parts with the highest quality, exact fitness and appropriate function. with our global distributor network, you are guaranteed with fast deliveries and services, wherever you are, please submit your spare parts request to us, and list products name, model, equipment serial number, description of required parts, we guarantee that your request will be handled quickly and appropriately.

Boom Crane

Boom Crane,Boom Truck Crane,Boom Auto Crane,Boom Truck Mounted Crane

Jining Sitong Construction Machinery Co.,Ltd , http://www.cntruckcrane.com